Minh Son Construction and Trading Joint Stock Company has a lot of experience in the construction of traffic works, including the construction of concrete highways. Below is Minh Son Concrete's highway construction process:

1. Site preparation: Before the construction of the highway, the company's engineers and workers will come to the site to assess the topography, drainage capacity, soil foundation and create conditions for site preparation.

2. Road excavation: After the terrain has been prepared, the team of workers will proceed to dig the road, arrange the drainage system, power lines, telecommunications, culverts and bridges.

3. Laying of rock: A layer of rock is poured over to create a foundation for the concrete to be poured on. The team of workers will use excavators and compressors to compact the rock.

4. Cut the roadway: After the rock layer has been poured and compacted, the team will cut the roadway, creating grooves containing concrete to help the road surface better adhere.

5. Concrete pouring: After completing the preparation, stone pouring and trenching, the workers will pour concrete on the road surface. Concreting is done by using a concrete pourer and a compressor to compact the concrete.

6. Creating grinding lines: After the concrete has dried, the team of workers will proceed to create grinding lines on the road surface to increase adhesion and reduce friction when the vehicle is running on the road.

7. Construction of electric streaks: The company's team of engineers and workers will install electric streak systems on highways to help reduce traffic accidents and increase safety for road users.

8. Finishing the road: After the above stages have been completed, the company's workers will complete the road by painting the road, marking the road markings and arranging traffic signs to ensure safety. for all road users


However, the process of highway construction still faces many challenges and difficulties. To ensure the quality of the works, Minh Son Construction and Trading Joint Stock Company has applied many measures to minimize risks and enhance safety for workers, including:
  • Using modern machinery: In order to reduce labor and increase efficiency, the company uses modern machines such as excavators, compressors, concreting machines, road cutters, road grinders, etc.

  • Training and capacity building for workers: The company regularly organizes training and coaching courses for workers on skills and occupational safety.

  • Checking the quality of materials: The company only uses materials that meet quality standards and have clear origins to ensure the sustainability and adhesion of concrete.

  • Project quality control: The team of engineers and project managers will regularly check the quality of the works to ensure the accuracy and progress of the project.

  • Applying advanced technology: The company always updates the latest technologies in highway construction, such as self-propelled concrete mixers, large excavators, etc. to increase efficiency and minimize errors during construction.